Home
Industrial systems
MES · Manufacturing execution QMS · Quality management SCADA · Data acquisition WMS · Warehouse management
Data visualization
BI dashboards
Applied AI
AI visual inspection AI short drama AI avatars
Services & company
Custom engineering Implementation About us Contact Book a demo
Implementation

Start where it
hurts most

Neither digitalization nor AI has to land all at once. Find the bottleneck that hurts delivery, cost or content output, start in that one place, get data out of it, then extend along the chain. We break the risk into five milestones, each ending in something you can accept.

Typical scenarios

Six common problems, six ways in

In one plant the bottleneck may be machines, quality, or numbers that never agree. Pick the sorest spot, do it properly, then widen.

Shop-floor visibility

Order progress, WIP and machine status up on the wall. No waiting for the daily report, no walking the floor to ask.

MES + SCADA

Machine connectivity

An old machine has no network port; one gateway connects it. Without replacing anything, utilization and downtime reasons become visible.

SCADA

Quality traceability

One defect traces to its batch, machine parameters and the shift on duty. Corrective actions are on record instead of in memory.

QMS + MES

Full visual inspection

Scratches, burrs and missing parts — the checks people miss after hours of looking — go to a model: inline verdict, automatic reject, images kept.

AI visual inspection

Legacy integration

ERP, PLM and an old MES each keep their own books. No interface? We adapt. Definitions differ? We unify them.

Custom engineering

Executive dashboard

Output, delivery, quality, stock and energy side by side, drilling from plant to line to shift.

Custom + data
Method

Project risk, broken into five milestones

Industrial software and AI only pay off if they land. Every stage has a deliverable and acceptance criteria, with scope and pace agreed in the open.

An engineer with a laptop at an open control cabinet, commissioning a gateway
Commissioning happens on site, not in the proposalGateway, interface and line commissioning, with our engineer staying until acceptance.

Illustrative render · AI-generated

01

Site survey and diagnosis

Output · Diagnosis report, cost estimate

Line walkthroughs, process mapping and a data audit, ending in a diagnosis report and a cost-benefit estimate.

02

Solution design and blueprint

Output · Implementation plan, milestones

System boundaries, integration points and hardware, ending in an implementation plan and signed milestones.

03

Build, configure, integrate

Output · A build you can demo

Standard configuration, custom build, machine data and ERP interfaces, confirmed with staged demos.

04

Pilot run and training

Output · Manuals, training

Parallel running to compare the numbers, role-based training, manuals and a test bank.

05

Acceptance and tuning

Output · Sign-off sheet, support plan

Item-by-item acceptance, three months of warranty, then annual support and tuning.

What we commit to

Go-live is only the start

The years after delivery are longer. Response times, acceptance criteria, training and coaching go into the contract.

30-minute response

Tickets answered within 30 minutes in working hours; line-down issues attended the same day.

Acceptance agreed up front

The function list and acceptance criteria are agreed at contract stage, so nobody argues at go-live over whether it is finished.

Knowledge transfer

Manuals handed over, your technicians trained on site.